Posted on October 3, 2021October 3, 2021 by T & L GeistThe Devil’s in the details South Elevation. Roofing almost done. North Elevation at RV Dock. Rear Deck Soffit Front Eave Soffit Roof Vent at South Soffit. Two Step Fascia (will be flashed with matching sheet metal). Garage Doors not due til late January 😡 Plastic wrap til then… Garage Door Framing Loving the natural condition of the Reclaimed Corral Wood Textured Black Wainscot The window trim absolutely kills it 👍. The quality of work is fantastic. More power, is POWER! Of course, can’t forget the HVAC 🤦🏻♂️. Hoback River Tributary So far, Sept/Oct has not disappointed. Just stunning. Yeah, they like it too 🐾.