Posted on November 25, 2021November 25, 2021 by T & L GeistLittle by Little… Drywall is finally moving along 🤞 In Family room, looking down hallway (right) and Stairwell (left). Looking into the Master Bedroom with Laura’s office up the steps, walk-in closet to the left. Bunkroom. Upstairs Bathroom. Kitchen and french doors out to the deck. In the garage, rear roll-up door in back. Doors on right side (from back to front), Mech Room, Laundry, Restroom. Dog wash and mud room, forward right. Same rooms, before drywall. Forward half of mud room with a glimpse of the front door (left). South side electrical getting an enclosure with roll-up door. 600Amp Service 🤦🏻♂️ Home Sweet Home.